Treatment and Operation of Water Transmission from Al-Mujeb Dam to North Karak Governorate .
Location: Jordan
Date: February/2015 – May/ 2015
Client: Gama Contracting
Description:
The project aimed to treat and transmit Mujeb Dam water to villages in North Karak governorate so this area is provided with Potable water.
The project consisted of the following components;
Designs of Buildings:
- Design of the Administration Building (18*10)m2
- Design of pump station building in Site#1, site #2, Site #3 and site #4
Designs of Reservoirs:
- 4 Reservoirs for treated water in Site #1, Site #2 , Site #3 and Site #4
- Reservoir for raw water in Site #1
The following are the actual services that were provided by RUQN during the project’s period:
- First stage: Preliminary engineering studies
- Second Stage: Detailed engineering designs and Architectural and structural drawings for buildings, reservoirs and detailed site layout.
- Third Stage: Detailed designs and architectural, structural, electrical and mechanical drawings for the administration building at site #1.