Location: Jordan
Date: August/2016 – June/2017
Client: MIYAHUNA
Description:
The project consisted of supplying main water networks, Ductile pipes with diameters that ranges between 150 – 200 ML) and PE pipes with various diameters (25,63,125 and 180 ML). In addition to the installation of all necessary components and constructing the related manholes and necessary house connections and separating the old pipes.
The Total length of the new network is 40 KM.
The Construction Cost of this project is $ 2.1 Million
RUQN conducted the Construction Supervision services related to this project.