Preparation of Studies, Detailed Designs and Tender Documents for Alternative Wastewater Pipelines for the Main Transmission Pipelines in Amman Governorate and the Construction Supervision Services.
Location: Jordan
Date:
Design: February /2007 – November -2008
Supervision: April/ 2009 – December /2013
Client: Ministry of Water & Irrigation / Water Authority of Jordan (WAJ)
Description:
The project included the Studies, designs, preparation of tender documents, in addition to the construction supervision services for alternative wastewater pipelines for the main transmission pipelines in Amman Governorate and to connect all areas served previously and the new additional extensions on the main alternative sewer lines.
Total length of sewer lines is 40 KM with diameters; 1,200, 1,500, 800, 600, 500, 400, 300 mm (D.I.P, RC, C.P)
The project was divided into Seven (7) contracts as follows;
RUQN was responsible for conducting the studies, designs, tender documents for the alternative wastewater pipelines in Amman governorate. In addition to the construction supervision services and the closeout of the project.