Location: Jordan
Date: June /2016- September /2017
Client: Ministry of Public Works & Housing (MPWH).
Description:
The project included the construction of a secondary boys’ school at Ghour Al Safi (Al Safi Valley) with a total area of 5,960 m2. The building composed of two floors; Ground Floor and The First floor with an area of 75m2 of stairs.
RUQN was responsible for the construction supervision services related to this project.